Listen to Part 1
Listen to Part 2
EPS is one of the leading installers of wind turbine generators in the state of Ohio. That's not just a marketing statement said to impress potential customers, it's the truth.
By the summer of 2009, EPS will have installed eight wind turbine generators of varying sizes in the state of Ohio alone. Along with the twelve current installation projects, EPS is also preparing proposals for installations in several other locations throughout Ohio.
During the proposal phase EPS analyzes your electric bills and energy usage to see what size wind generator you'll need to meet your energy need. We study the wind production potential or your area to see if there is enough steady wind to generate power. We evaluate your site to make sure there is enough space for a turbine, and we also work with the state of Ohio to make sure you are receiving the maximum grant possible for the wind turbine you are installing.
Once we move on from the proposal phase, it's time to install your wind turbine generator. Each of the projects listed below have moved past the proposal phase and have committed to at least one wind turbine installation on their property.
Project Name |
Location |
Quantity |
Wind Turbine Size |
Perkins High School |
Sandusky, Ohio |
3 |
ReDriven - 20kW |
Encore Plastics |
Castalia, Ohio |
1 |
50kW |
Turtle Plastics |
Lorain, Ohio |
1 |
ReDriven - 20kW |
Happy Days Boating |
Port Clinton, Ohio |
1 |
50kW |
Upper Scioto School District |
McGuffie, Ohio |
2 |
100kW |
Project Name |
Location |
Quantity |
Wind Turbine Size |
Conneaut Waste Water Treatment Plant |
Conneaut Ohio |
1 |
400kW |
Conneaut Middle School |
Conneaut Ohio |
1 |
600kW |
Sandusky Water Treatment Plant |
Sandusky, Ohio |
1 |
600kW |
Sandusky Waste Water Treatment Plant |
Sandusky, Ohio |
1 |
600kW |
For more information about wind turbine installations for your home business or municipality, contact us at 419-433-7048, or e-mail info@bestuseofenergy.com.